MECH BAY 03ASSEMBLY HANGAR
PART SHEETS GPT IMAGE 2.5 3D PARTS TRIPO P2 PIPELINE SCENARIO WORKFLOW BUILT WITH CLAUDE OPUS 5.5
DRAG TO ORBIT · CLICK A PART ON THE FRAME OR ON A RACK
Field certificate

UNIT 03

Assembled in Mech Bay 03 and cleared for field duty.

Every part was generated in a Scenario workflow: reference mecha, isolated part sheets with GPT Image 2.5, meshes with Tripo P2. Fitting, crane rig and hangar built by Claude Opus 5.5.
Scenario × Claude · playable demo

MECH
BAY 03

Three heavy frames came off the line in pieces. Their parts hang on the racks. Swap legs, cores, arms and heads between them with the gantry crane, watch every part lock in, then roll your build out of the gate.

1Reference mechaSCENARIO
2Isolated part sheetsGPT IMAGE 2.5
3Part to 3D modelTRIPO P2
4Fitting + hangarCLAUDE OPUS 5.5
Loading parts 0 / 18
FRAME 01Gray and orange mecha with a gatling arm and missile pods
IRONCLAD-03GATLING · MISSILES
FRAME 02Yellow worksite mecha with a claw arm and floodlights
FOREMAN-YCLAW · DRILL RIG
FRAME 03Red armored mecha with an arm cannon and a heavy fist
CRIMSON WARDENSIEGE CANNON · FIST